GPI Ohorayama

Ohorayama Wind

Location Otsuki, Kochi Prefecture
Site Type Forest land
Power Purchaser Shikoku Electric Power Co
Turbine Manufacturer General Electric Company
Turbine Size 3 MW
Project Capacity 33 MW
Revenue PPA(Fit)
Contract Tenor 20 Years
Commercial Operation March 2018



The Ohorayama Wind Facility was the second wind project completed in Japan by GPI. The Ohorayama Wind Facility is located on the southern part of the island of Shikoku in Kochi Prefecture.

The facility reached commercial operation in March 2018, and sells 100% of its electrical output under a feed-in-tariff (FiT) secured power purchase agreement (PPA) to the utility Shikoku Electric Power Co.

Copyright © Green Power Investment Corporation. All rights reserved.